HUD PIH directory · Section 8 / HCV

Mountain Projects, Inc., Section 8 / HCV PHA profile

Mountain Projects, Inc. administers federal Section 8 / Housing Choice Voucher rental assistance, NC, with 1,083 authorized HCV units. Contact details, payment-standard reference, and nearby PHAs to broaden your waitlist strategy.

1,083
Authorized HCV units
76th
National size percentile
78th
NC size percentile
83
NC FMR areas
HUD PIH FY25 directory NC · Section 8 / HCV 1,083 HCV units 78th percentile in NC
Browse all NC PHAs

How this PHA compares nearby

Authorized HCV units · Mountain Projects, Inc. vs nearby NC agencies

units
Source HUD PIH authorized-unit directory As of FY2025

The verdict

Mountain Projects, Inc. administers 1,083 authorized Housing Choice Vouchers - a mid-to-large Section 8 agency nationally, larger than 78% of NC agencies.

1,083
authorized Section 8 vouchers
76th
percentile by size, nationally
78th
percentile in NC
B-
Composite Score
69/100
Mountain Projects, Inc.

Based on authorized voucher scale, HUD's own PHAS performance designation, and state-wide housing-cost context from federal sources -- not wait-list length, application difficulty, unit quality, or day-to-day service experience.

Scale B+
1,083 units
Authorized Section 8 / HCV units, national percentile among reporting PHAs
HUD Performance N/A
Not rated
HUD Public Housing Assessment System (PHAS) designation
Cost Context C
$998/mo
State-wide median 2BR payment standard (83 areas, 2026) -- not this PHA's specific service area
1,083 Section 8 units

HUD's directory lists Mountain Projects, Inc. in NC with a reported Section 8 / Housing Choice Voucher authorization with 1,083 authorized Section 8 units. Contact the agency directly to verify current programs, availability, and application information.

  • 78th percentile by unit count in NC

Section 8 / HCV units

1,083

Mid-to-large nationally

Total authorized units

-

not reported

State-rank percentile

78 th

Top quartile among NC PHAs

2-BR standard range · NC

$925–$1,750 /mo

Median $998/mo · 2-BR

Scale profile for Mountain Projects, Inc.

With 1,083 authorized Housing Choice Voucher units, Mountain Projects, Inc. sits at the 76th percentile of every U.S. PHA that reports an HCV ceiling , and at the 78th percentile inside NC. That puts it among the larger local administrators of federal rental assistance, not a single-office rural authority.

Across NC's 83 HUD FMR areas, FY2026 2-bedroom payment standards run $925–$1,750/month (median $998). A large PHA like this typically serves more than one FMR area, so applicants should look up the metro-specific standard rather than treating the state median as their number. 5 other NC PHAs appear in the nearby list below; comparing authorized-unit counts there shows whether Mountain Projects, Inc. is the dominant local issuer or one of several large peers.

Section 8 / HCV share of Mountain Projects, Inc. authorized units 100.0%
HUD nationwide median

The nationwide HUD median sits at 62%; agencies running a higher HCV share than that tend to lean toward tenant-based vouchers rather than project-based public housing stock.

Where Mountain Projects, Inc. sits among U.S. PHAs

By authorized Housing Choice Vouchers, across every PHA that runs them. Most are small; a handful of big-city authorities run the long right tail.

1,083 Top 24% higher than 76% of 2,129 voucher-running PHAs

0–10,000: 2,086 voucher-running PHAs (98%). This entry sits in this band. 10,000–20,000: 29 voucher-running PHAs (1%). Above this entry. 20,000–30,000: 8 voucher-running PHAs (0%). Above this entry. 30,000–40,000: 1 voucher-running PHAs (0%). Above this entry. 40,000–50,000: 1 voucher-running PHAs (0%). Above this entry. 50,000–60,000: 3 voucher-running PHAs (0%). Above this entry. 60,000–70,000: 0 voucher-running PHAs (0%). Above this entry. 70,000–80,000: 0 voucher-running PHAs (0%). Above this entry. 80,000–90,000: 0 voucher-running PHAs (0%). Above this entry. 90,000–100,000: 0 voucher-running PHAs (0%). Above this entry. 100,000–110,000: 0 voucher-running PHAs (0%). Above this entry. 110,000–120,000: 0 voucher-running PHAs (0%). Above this entry. 120,000–130,000: 1 voucher-running PHAs (0%). Above this entry. This PHA 0 130,000 every voucher-running PHA, bucketed by value

Each bar is a 10,000-wide band; taller bars hold more voucher-running PHAs. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count, share, and where it sits relative to this entry.

Source HUD PIH authorized-unit directory · FY2025

Inside HUD's Federal Record for Mountain Projects, Inc.

Mountain Projects, Inc. is one of 3,780 agencies HUD tracks in its PIH Open Data directory for the Section 8 / Housing Choice Voucher program operating in NC. HUD authorizes 1,083 Section 8 / HCV units for this agency.

HUD logs its program type as "Section 8," which determines which voucher streams (regular HCV, VASH, Family Unification, Mainstream, or project-based conversions) it can run. By Section 8 unit count among NC agencies, it lands at the 78th percentile, larger than 78% of its in-state peers. HUD reports this authorized-unit figure as a capacity field. It is not a live waitlist, availability, eligibility, or application-status signal.

its main line is 8284521447. Verify current programs, availability, and any application path directly with the agency. Across NC's 83 HUD FMR areas, the FY2026 2-bedroom payment standard runs $925-$1,750/month (median $998); Mountain Projects, Inc. sets its own figure within 90-110 percent of HUD's Fair Market Rent for the specific area it serves, so confirm the exact number for your metro before signing anything.

Contact this PHA

Phone
8284521447
Fax
8284529454
Email
pdavis@mountainprojects.org
Executive Director
ssimmons@mountainprojects.org · 8284924106
How to apply at Mountain Projects, Inc.

How to use this PHA record

HUD's directory reports 1,083 authorized Section 8 / Housing Choice Voucher units for Mountain Projects, Inc.. That is a reported authorization field, not a live waitlist, application, eligibility, or availability feed.

Use the contact details above to verify an agency's current programs and instructions directly. PlainVoucher does not predict an individual wait time, recommend an application path, or infer a household's eligibility from this directory record.

Payment standard reference

Payment standards are set per HUD FMR area, not per agency. Across NC's 83 HUD FMR areas, the FY2026 2-bedroom payment standard ranges $925–$1,750/month (median $998). These are area reference amounts, not a payment promise from Mountain Projects, Inc. for a particular household or unit.

Find your exact number: look up the 2-, 1-, and 3-bedroom payment standards for your metro with the payment-standard lookup tool, then confirm the current figure with the agency before relying on it. See our Payment Standards vs. FMR guide for the source-backed area context.

Nationwide PHAs with similar voucher scale or total HUD inventory

Two cross-state peer sets for Mountain Projects, Inc., outside NC so they are not the same-state scale matches above.

Similar authorized HCV units

Nearest nationwide agencies outside NC (1,083 HCV units here).

Peers are nearest-neighbor matches on HUD PIH authorized Section 8 units and total program inventory; agencies below 100 units on a metric are excluded from that axis.

Nearby PHAs in NC

Other NC PHA directory records with comparable reported unit counts:

Compare PHAs in NC side by side →

What to do with this PHA profile

Mountain Projects, Inc. is a HUD PIH directory record with 1,083 authorized HCV units.

  • Open the North Carolina state directory for PHA-count vs authorized-HCV context. North Carolina PHAs
  • Look up the HUD Fair Market Rent schedule that covers this market before reading payment-standard ranges. Payment standards
  • Read the process guides for waitlists, income limits, and portability - they explain HUD rules, not whether a household should apply. Guides hub

PlainVoucher is not affiliated with HUD or this PHA. Directory figures are informational only. Eligibility, waitlist status, and application routes are set by the PHA and change frequently - confirm with the agency directly.

Frequently Asked Questions

What does the HUD record show for Mountain Projects, Inc.?

HUD's PIH directory reports 1,083 authorized Section 8 / Housing Choice Voucher units for Mountain Projects, Inc. in NC. That authorization is a reported program-size field, not proof of a current waitlist, application route, eligibility decision, or available voucher.

Can I apply through this Mountain Projects, Inc. profile?

No. PlainVoucher's HUD directory record does not carry a live application or waitlist feed. Use the agency contact details to verify current programs, availability, application instructions, and eligibility directly before relying on this profile.

Is Mountain Projects, Inc. part of HUD?

HUD lists Mountain Projects, Inc. in its Public and Indian Housing directory as a local Public Housing Authority. This profile preserves HUD's reported record and contact fields; it does not establish the agency's current services or policies.

How should I read the payment-standard reference?

Payment standards vary by HUD Fair Market Rent area. PlainVoucher shows the published area reference, not a payment promise for a specific agency, household, or unit; confirm the current local figure directly before signing a lease.

Source: HUD PIH Open Data (FY25). The PHA directory source was consolidated in April 2026. Payment-standard figures: Source: HUD USER Fair Market Rent FY2026. If any contact detail has changed, please email corrections@plainvoucher.com. See our methodology for how we compile and cross-reference this data.

⚠ Disclaimer. PlainVoucher is not affiliated with HUD or with Mountain Projects, Inc.. Data here is compiled from HUD public sources for informational purposes only. It is not a substitute for consulting the PHA directly about eligibility, waitlist status, or application procedures.

Read our methodology, how this data is sourced, computed, and verified. · Verify with HUD →

Source and method. PlainVoucher compiles public HUD and U.S. Census release data into a searchable reference. Release periods and source boundaries are identified on each data surface; PlainVoucher does not determine eligibility, waitlist status, payment standards, or local PHA rules. Read our editorial standards and corrections policy, methodology, or report a data error. Data current as of 2026-09-02.